We want to renovate in stages, not all at once
A renovation can be spread over several years, as long as the first jobs don’t block the later ones.
What’s going on
A renovation can perfectly well be done in stages. The key is to prioritise, spot the jobs that depend on one another and build a coherent order over several years, taking into account your budget, the equipment that is wearing out and the climate expected in Limousin.
The classic trap: a job done today that complicates tomorrow’s. Windows fitted without thinking about the wall insulation that will follow, a boiler replaced like for like just before insulating, a wall re-rendered that will have to be stripped to insulate.
What you can already do yourself
Free, or nearly. This is general advice: your house may call for something different.
- List your equipment and its age: boiler, water heater, windows, roof. Whatever will fail within five years often sets the timetable.
- Reduce the need before changing the heating: an insulated house needs a smaller system, which costs less.
- Think about the junctions: where will the wall insulation be when you change the windows? Will the roof overhang be enough if you insulate on the outside?
- Set a realistic yearly budget, with a margin for surprises — they’re common in old houses.
When an outside view is worth paying for
- Before the first stage, to check it doesn’t close any doors.
- When something breaks down and a decision has to be made quickly: replace it like for like, or differently.
How I can help
Planning in stages is part of “Prepare a renovation”: it isn’t a separate service.
Prices include all taxes. The exact price is in the quote, sent after the free first conversation.
Is your house asking you this question?
Describe it in a few lines, in English of course. The first conversation is free: it’s for seeing what deserves a closer look, and whether I can help.
Talk about my house